Civil engineering Management & Consultancy

 

Wooden bridges Sneek

Wooden bridges Sneek

InVra plus has carried out the contract and construction management for the two wooden bridges in Sneek. Both bridges are made of laminated Accoya wood. The bridges are completely prefabricated in Schwabisch Hall and have been transported in components to Sneek.

SUSTAINABILITY

 

Sustainable development meets the needs of today without jeopardising the ability of future generations to meet their own needs: that is the definition of the UN Brundtland Committee from 1987. The practical solutions that InVra plus has always had close to its heart are therefore reflected in the theme of sustainability. Action rather than words. InVra plus does this in various ways:

 

1. CO2 footprint 
2. BCTR®; Bitumen Cement Treated Renewables

3. BCTR® Symposium
4. Prescribing sustainable designs
5. Wooden bridges

Main menu